Release date: May 19, 2008
ChangeLog for previous version 2.9.1.10
Proxy support
In some cases our license service was
unavailable due to a proxy settings. ScrumDesk supports now the
proxy with authentication. Internet Explorer proxy settings are used
by default. If you are using proxy password, set it by a click on a
Proxy hyperlink in a login dialog.
Set proxy URL, port, login name and the
password. If you want to use Internet Explorer proxy settings, click
Use Default button. In this case, password can not be used
from Internet Explorer settings!
Story impediments
Story attachments
Every story can have attached files. This can
be any type of the file. Typically attachments are stored in a place
that is accessible to all team members. In advance, ScrumDesk
supports attachment upload into a project database. This way the
attachments are accessible for all even the team members can't use
file sharing based on a operating system.
Attachment can be opened by a double click or
by Open button
.

SideView
SideView has been significantly enhanced. In a
previous version this view displays burn down chart and the
statistics for a current sprint. From the version 2.9.5 SideView
becomes centralized place for project related assets.
SideView - Project
Tab Project displays basic information about
the current project: project name and server and database containing
this project.
All team members are displayed in a list. For
every member is displayed picture, name, project role and a team
name. Team members can be filtered entering text.
Member of the team can be directly contacted
by IP phone or an email. These buttons are enabled if the user has
filled corresponding information.
Story assign by a drag and drop
You can assign the user to a story or a task
just by using drag and drop. Drag a picture to the story or vice
versa.

SideView - Backlog
Next Sprint View, known from previous
ScrumDesk versions, has been integrated into the SideView.
Functionality of the panel doesn't change. Just drag a story from
the panel to main board or vice-versa.

SideView - Search
ScrumDesk supports search now. As a result is
displayed name of the founded asset and an attribute name in which
searched text has been found. Result are grouped by the assets type.
To display more details, double click on the
row. Details are displayed only for a sprint, release, story,
impediments and attachments.

Tags
To better categorize stories, tags can be used
now. Any story can be tagged by one or more tags. Tags must be
separated by ";" character.
Stories can be easy filtered
using a tag cloud, a feature known from a many
web sites. To displays all stories, click Show all stories button.

Filter dialog has been enhanced to support tags also.
If Backlog or Sprint view displays only tagged stories, information
panel displays the tag name.

SideView - News
When a story or an idea has been changed in
previous ScrumDesk version, notification appeared in a screen right
bottom corner. Now, these notifications are displayed in a News
panel. In advance, after the ScrumDesk starts, it will displays all
changes from a last user's logout.

To display more details, double click on the
row. Details are displayed only for a sprint, release, story,
impediments and attachments.
SideView - About Me
SideView panel About Me enables to a
logged user to change contact details. First name, last name and
login name are not allowed to change due to a ScrumDesk licensing
policy. Only ScrumDesk administrator can change these details.
Picture can be changed by a click.

Reports
Version 2.9.5 offers new reports requested by
a
customers.

Parking Lot
Parking lot displays themes statistics view. Every theme is displayed as a card with:
- theme name,
- count of the theme's stories
- number of completed story points for theme stories
- total number of story points for theme stories
- progress indicator with % of completeness
If no theme exists, one card with overall statistics
is displayed.

Time sheet
This report displays sprint progress in a form of the time
sheet. The time sheet is generated for all team members and selected
sprint.
On a row are displayed stories and a tasks. The stories are
displayed with yellow background.
Under a story's or task's name is displayed name of the team
member who is working on given tasks. In second column is
displayed duration estimated before the task starts. Following
columns displays values entered in a given day by the team
member.
In advance, for some values is displayed small arrow. Color of
the arrow indicates exception of the estimated value.
Green arrow indicates advance in a progress.
Red horizontal
arrow indicates that in given days no progress has been
recognized. This can indicate some unexpected problems with
implementation or that the user doesn't update value.
Orange up
arrow indicates that value has not decreased, but increased.
Values displayed with a gray color are values for other team member
who participates on the given task.
Stories and tasks can be easy filtered by a click on the team
member. Multiple team members can be selected. Team
members can be easy filtered by a filter text box in the right
upper corner of the screen.
Sprint can be selected in a combo box from left top corner.

Detail of the story can be started by a double-click.
Other significant changes
Story card
- displays team members name who are
working on the story
- creating a story from a task by drag and
drop on the desk
Stories grid
- theme support included
- displays team members name who are
working on the story
Retrospective
- idea category - user can enter free text
(i.e. What can be better, What was wrong,...)
|